BS1139 Scaffolds Use in Falsework and Working Scaffolds

BS1139 Scaffolds use in falsework and working scaffolds

Details

BS1139 scaffold

Technique

Longitudinal Electronic Resistance Welding(ERW)

Size

Diameter

W.T

Length

48.3

4.0

6M/6.4M

Surface

Bare, painted, oiled, hot dipped galvanized

Ends

Plain ends, round beveled

Packing

Packing in bundle with steel strips; with seaworthy package at the end;

Inspection

With Chemical Composition and Mechanical Properties Testing;Dimensional and Visual Inspection, With Nondestructive Inspection

Application

Urban construction pipe, Scaffolding pipe, Building material tube, etc

Trade Terms

FOB, CFR, CIF, EXW, etc.

Payment

L/C, T/T

Delivery Time

Usually within 10-30 days after receipt of deposit, ASAP

Loading Port

Xingang , Tianjin

Should you're interested in the low price bs1139 scaffolds use in falsework and working scaffolds, welcome to get the free sample from our factory and check the quotation with us. As one of the leading such manufacturers and suppliers in China, we will offer you a discount.

Feedback

Subscribe to our email list
Sign up with your name and email to get the latest proway updates, exclusive access to promotions, sales events, pre-order sales & more!
Connect with Honson
Become our fan, follow us & subscribe for the latest updates and deals
QR Code
  • About Us
  • Products
  • News
  • Exhibition
  • Contact Us
  • Copyright © Tianjin JCADTO Steel Pipe Co., Ltd. All rights reserved.