Home > News > Content
Fittings Meet Design Requirements
Jun 20, 2017


Before the pipe is put into operation, it is necessary to check whether the design meets the design requirements and meet the basic installation conditions. And then after the completion of the installation site to clean up the clean and tidy, the completion of the main structure of the acceptance. Note that the installation of the pipeline to be designed by a professional staff. Finally, Pipe Fittings to detect the bracket of the pipe, the location of the reserved hole is in line with the professional standards.

The pipe structure is reasonable, the strength of the force, but also in the fire pipe also has a wide range of applications, pipe fittings in the course of the main role is the pressure vessel.

Pipe fittings need to change the direction of the pipeline, Pipe Fittings so the use of a wide range, mainly used in chemical, civil, construction, industrial production and other fields.

Hot press elbow is a kind of pipe. Hot pressing elbow is a kind of elbow produced by hot pressing process. Hot pressing elbow is the tube after heating with a professional equipment processing, and then cut to the critical temperature above the insulation, insulation for some time soon into the quenching agent, so that the temperature suddenly reduced to more than the critical cooling rate of rapid cooling method Made of elbow. Pipe Fittings Treatment quenching is the elbow heated to above the critical temperature, insulation for some time, and then quickly into the quenching agent, so that the temperature suddenly reduced to more than the critical cooling rate of rapid cooling, and to obtain the main martensite Of the unbalanced tissue of the heat treatment method. Quenching can increase the strength and hardness of steel, but to reduce its plasticity. Quenching commonly used in the quenching agent are: water, oil, alkaline water and salt solution.

Before the pipe is put into operation, it is necessary to check whether the design meets the design requirements and meet the basic installation conditions. And then after the completion of the installation site to clean up the clean and tidy, the completion of the main structure of the acceptance. Note that the installation of the pipeline to be designed by a professional staff. Finally, Pipe Fittings to detect the bracket of the pipe, the location of the reserved hole is in line with the professional standards.

The pipe structure is reasonable, the strength of the force, but also in the fire pipe also has a wide range of applications, pipe fittings in the course of the main role is the pressure vessel.




Subscribe to our email list
Sign up with your name and email to get the latest proway updates, exclusive access to promotions, sales events, pre-order sales & more!
Connect with Honson
Become our fan, follow us & subscribe for the latest updates and deals
QR Code
  • About Us
  • Products
  • News
  • Exhibition
  • Contact Us
  • Copyright © Tianjin JCADTO Steel Pipe Co., Ltd. All rights reserved.