Home > News > Content
BS1139 ERW Scaffolding Steel Pipe
May 12, 2017

Basic Info

  • Model NO.: BS1139 ERW Scaffolding Steel Pipe

  • Technique: Hot Rolled

  • Surface Treatment: Galvanized

  • Section Shape: Round

  • Delivery Time: Within 15 Days After Receiving The Down Payment

  • Warranty: Within 90 Days After Receiving The Pipes

  • Type: Welded

  • Material: Carbon Steel

  • Usage: Construction & Decoration

  • Brand: JUNCHENG

  • Payment: T/T or L/C at Sight

  • Product Description

Product Description

We are the fully owned subsidiary corporation of JUNCHENG Group,which is the window to do the import &export business of JUNCHENG Steel pipe group,and it is also the tie and bridage for JUNCHENG steel pipe group into the world.


Our mainly produce ERW STEEL PIPE ,hot galvanized steel pipe, spiral steel pipe and tinplate.

if you are interested ,welcome to contact me.



Packaging & Shipping

1) In bundle with steel strips; 

2) First packing by plastic bag then strips; 

3) Client' requirements 

 

shipping: 

1) less than 5.85m ,20ft container 

2) more than 5.85m ,less than 11.8m, 40ft container


Our Services

1.production validity: within 90 days after receiving the cargo, if the clients have any problems, everything can be discussed . As long as quality problems, we support sale return or compensation.

2.support SGS and BV inspection

3.delivey timely .after signing the contract ,we can delivery within 20 days 

 

Company Information

 JUNCHENG steel pipe is the biggest manufacturer of welded steel pipes, mainly products including ERW steel pipe ,hot galvanized steel pipe,spiral steel pipe and tinplate. 

There are total 20 ERW steel pipe production lines, 16 hot galvanized steel pipe production lines,6 SSAW steel pipe production lines,3 national laboratory .


1.Q:Are you a factory or trading company?

A:We are a factory.we also have cooperated factory doing other steel business.

 

2.Q:Where is your factory located? How can I visit there?

A:Our factory is located in Tianjin City, China, about 30 minutes from beijing by train.All our clients from home or abroad are warmly welcome to visit us!

 

3.Q:Can I get some samples?

A: Yes,we are honored to offer you samples.

 

4.Q:How does your factory do regarding quality control?

A:"Quality is priority. Our factory has gained BV, SGS authentication. We guarantee the goods out from our factory 100% qualified.And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished, we will make the last test to pick up the unqualified products

 

5.Q: How long does your warranty?

we can assured the quality within 90 days after your receiving the cargoes.

 

6. Q: What is your MOQ?

 as long as hold one container ,we can accpet the order.

 

7. What is your payment ? 

if the quantity more than 100 tons , 100% l/c at sight can be accpeted. Less than 100 tons ,30% t/t in advance ,70% balance agianst with B/L copy.

 

If you have any question ,welcme to contact us.

 

Subscribe to our email list
Sign up with your name and email to get the latest proway updates, exclusive access to promotions, sales events, pre-order sales & more!
Connect with Honson
Become our fan, follow us & subscribe for the latest updates and deals
QR Code
  • About Us
  • Products
  • News
  • Exhibition
  • Contact Us
  • Copyright © Tianjin JCADTO Steel Pipe Co., Ltd. All rights reserved.